Skip to main content Skip to footer

Standard Operating Procedures

Number Category Subject Effective Date
2003-2 Demolition Clarify the procedure for the demolition of buildings with a basement 01/01/03
2005-1 Architects / Engineers Amended architect/engineer plan preparation clarification 08/19/10
2006-3 Plumbing Plumbing fixture design criteria 05/24/06
2006-05 Fire Locking fire department connections 07/01/06
2006-06 Manufactured Homes Grandfathering 30 PSF roof snow loads for existing manufactured homes 07/16/06
2007-01 Electronic Plans Electronic permit submittals from all designers 02/01/07
2007-02 Fuel Gas Fuel gas inspection & unlock 02/07/07
2008-01 Attic Access in a Closet Attic access located in a closet or small room 01/01/08
2008-03 On-Site Plans Approved plans required at the building site 09/01/08
2024-11 Cold Weather Concrete Cold weather concrete requirements 11/21/24

Contact Us

Phone: (208) 769-2267
Fax: (208) 769-2237
710 E. Mullan Ave.
Coeur d'Alene, ID 83814
Schedule an Inspection: 208-769-2391

Hours

Mon — Fri 8am — 5pm