Standard Operating Procedures
| Number | Category | Subject | Effective Date |
|---|---|---|---|
| 2003-2 | Demolition | Clarify the procedure for the demolition of buildings with a basement | 01/01/03 |
| 2005-1 | Architects / Engineers | Amended architect/engineer plan preparation clarification | 08/19/10 |
| 2006-3 | Plumbing | Plumbing fixture design criteria | 05/24/06 |
| 2006-05 | Fire | Locking fire department connections | 07/01/06 |
| 2006-06 | Manufactured Homes | Grandfathering 30 PSF roof snow loads for existing manufactured homes | 07/16/06 |
| 2007-01 | Electronic Plans | Electronic permit submittals from all designers | 02/01/07 |
| 2007-02 | Fuel Gas | Fuel gas inspection & unlock | 02/07/07 |
| 2008-01 | Attic Access in a Closet | Attic access located in a closet or small room | 01/01/08 |
| 2008-03 | On-Site Plans | Approved plans required at the building site | 09/01/08 |
| 2024-11 | Cold Weather Concrete | Cold weather concrete requirements | 11/21/24 |